Properties
- Unit
- pack
- Shelf life
- Does not spoil
- Supply chain
- Metal & machinery
Made by
- Construction Materials Works
- 588 packs/wk · 63 staff
- Technology
- Requires Converter Steelmaking
- · Coal
- 7.43 t/wk
- · Steel
- 119 t/wk
- · Sand and Gravel
- 90.7 t/wk
- · Timber
- 11 t/wk
Technology needed
- Converter Steelmaking
- Construction Materials Works line
Standard unit cost per pack
- Materials
- $7.13 (98%)
- Wages
- $0.11 (1%)
- Operating costs
- $0.027 (0%)
- Freight
- $0.37, paid by the buyer, not in the total
- Total
- $7.26
