Properties
- Unit
- tonne
- Shelf life
- Does not spoil
- Supply chain
- Chemicals
Made by
- Glassworks
- 25.8 t/wk · 30 staff
- · Coal
- 91 t/wk
- · Soda Ash
- 4.68 t/wk
- · Sand and Gravel
- 22.1 t/wk
Standard unit cost per tonne
- Materials
- $5.97 (51%)
- Wages
- $4.66 (40%)
- Operating costs
- $1.17 (10%)
- Freight
- $1.06, paid by the buyer, not in the total
- Total
- $11.79
