CAPITALIUM The Age of Capital

Electromechanical Materials Pack

Products

Properties

Unit
pack
Shelf life
Does not spoil
Supply chain
Metal & machinery

Made by

Construction Materials Works
84 packs/wk · 63 staff
Technology
Requires Industrial Power
· Coal
9.34 t/wk
· Copper
55.3 t/wk
· Glass
21.3 t/wk
· Steel
21.3 t/wk
· Timber
3.19 t/wk

Technology needed

Industrial Power
Construction Materials Works line

Standard unit cost per pack

Materials
$87.58 (99%)
Wages
$0.75 (1%)
Operating costs
$0.19 (0%)
Freight
$1.38, paid by the buyer, not in the total
Total
$88.52