Properties
- Unit
- pack
- Shelf life
- Does not spoil
- Supply chain
- Metal & machinery
Made by
- Construction Materials Works
- 84 packs/wk · 63 staff
- Technology
- Requires Industrial Power
- · Coal
- 9.34 t/wk
- · Copper
- 55.3 t/wk
- · Glass
- 21.3 t/wk
- · Steel
- 21.3 t/wk
- · Sand and Gravel
- 12.8 t/wk
- · Timber
- 3.19 t/wk
Technology needed
- Industrial Power
- Construction Materials Works line
Standard unit cost per pack
- Materials
- $87.58 (99%)
- Wages
- $0.75 (1%)
- Operating costs
- $0.19 (0%)
- Freight
- $1.38, paid by the buyer, not in the total
- Total
- $88.52
