Properties
- Unit
- pack
- Shelf life
- Does not spoil
- Supply chain
- Metal & machinery
Made by
- Construction Materials Works
- 2,299 packs/wk · 139 staff
- · Coal
- 14.5 t/wk
- · Sand and Gravel
- 443 t/wk
- · Timber
- 38.6 t/wk
Standard unit cost per pack
- Materials
- $0.11 (58%)
- Wages
- $0.06 (33%)
- Operating costs
- $0.015 (8%)
- Freight
- $0.21, paid by the buyer, not in the total
- Total
- $0.18
