CAPITALIUM The Age of Capital

Machine Parts

Products

Properties

Unit
tonne
Shelf life
Does not spoil
Supply chain
Metal & machinery

Made by

Steelworks
1.65 t/wk · 12 staff
· Coal
1.91 t/wk
· Raw Hides
0.033 t/wk
· Iron
1.82 t/wk

Standard unit cost per tonne

Materials
$9.90 (21%)
Wages
$29.09 (63%)
Operating costs
$7.27 (16%)
Freight
$1.06, paid by the buyer, not in the total
Total
$46.27