CAPITALIUM The Age of Capital

Railway Kit

Products

Properties

Unit
pack
Shelf life
Does not spoil
Supply chain
Metal & machinery

Made by

Construction Materials Works
196 packs/wk · 63 staff
Technology
Requires Railway Surveying
· Coal
23.7 t/wk
· Iron
29.7 t/wk
· Steel
119 t/wk
· Timber
59.4 t/wk

Technology needed

Railway Surveying
Construction Materials Works line

Standard unit cost per pack

Materials
$22.70 (97%)
Wages
$0.64 (3%)
Operating costs
$0.16 (1%)
Freight
$1.17, paid by the buyer, not in the total
Total
$23.50